2027 cost ranges for primary suite additions in Eden, Huntsville, Liberty, Mountain Green, and Morgan, and what drives the number.
In 2027, a primary suite addition in Eden, Huntsville, Liberty, Mountain Green, or Morgan typically runs $170K to $450K+. Where you land depends on size, whether it's ground floor or second story, and above all how the bathroom is finished.
A typical primary suite is a new bedroom, a private bath, and a walk-in closet. From there it can grow into a sitting room, a private deck, a fireplace, a steam shower, or heated floors.

These are all-in figures, including permits, labor, materials, site supervision, and our fee.
Because of the new bathroom, primary suites cost more per square foot than other additions. In the Salt Lake market, a midrange suite averages around $450 per square foot. Design and engineering are included when we run the project design-build. If you bring your own architect, those fees are separate. See our pricing.
Every structural addition needs a building permit with engineered drawings. Who issues it depends on where you are:
We manage permitting from application through every inspection. See our Ogden Valley City permit guide.
At this size, you should know where every dollar goes. We build on open books: you pay the actual cost of the work, with site supervision at our cost, plus one fixed fee set up front that only changes if the scope changes. Every invoice is in your JobTread client portal, and if the project comes in under budget, you keep the savings.
Plan on 6–10 months from first conversation to Commissioning. Start in late winter and you're in good shape for a late-summer or fall finish. Every addition carries our 36-month workmanship warranty.
Bring your own architect or interior designer, or we'll run the project design-build with one of our partner designers. Either way, bring us in early so we can give real-cost feedback before decisions are locked in.
In the Ogden Valley and Morgan County, most run $170K–$450K+ in 2027, depending on size, location in the house, and the bathroom.
Usually, yes, because of the engineering, shoring, stairs, and roof work.
About 6–10 months from first conversation to Commissioning, including 2–4 months of preconstruction.
Usually, yes, especially for ground-floor suites. We'll plan the work to keep disruption down.
Tell us about your home and what you'd like to add. We'll give you a straight cost range and timeline, with no commitment. Read our home addition cost guide, see how we run home additions, or start a conversation.